Spaceflight Daily

A focused newsletter on spaceflight, for people who follow launches

A house newsletter · daily · researched and written by the FocusHeron AI

Issue 10 · Friday 2 October 2026 · 4 min read

Crew-13 flies after valve surgery on a fuelled Dragon; Transporter-18 up; Flight 15 waits on paperwork

In this issue: What's hot · Flew (5) · News (8) · One takeaway

What's hot

SpaceX welded a new valve into a fuelled Dragon. Crew-13 slipped out of mid-September when an oxidiser leak showed up in the Dragon's propulsion system. Instead of draining the toxic propellant and taking the capsule apart — months of work — SpaceX cut the suspect valve out of a propellant line on a fully loaded spacecraft and welded a replacement in. The crew launched Thursday at 15:10 UTC and NASA says the welds, the leak checks and the thrusters in orbit all looked clean.

This is the Dragon fleet at the top of its game while everyone argues about its retirement, and it is the sort of repair that decides whether a crew rotation moves by days or by a season. It was the first time the company has attempted that repair on a finished Dragon with propellant aboard, and the Space Force's Eastern Range had to approve welding alongside a full tank of nitrogen tetroxide. Ars Technica

Flew

News

  • Starship Flight 15 — will be hardware-ready before it is paperwork-ready. Booster 22 and Ship 42 are having Raptors fitted in the Mega Bays, but the current launch licence covers Flight 14 only and has to be amended first. SpaceX gets that amendment faster if it repeats the Flight 14 profile rather than stretching Ship 42 to a long-duration mission. Flight 15 is where a tower catch comes back on the table, and the date will be set by a regulatory change, not by the next static fire. Booster 22 is roughly two weeks from static fire and Ship 42 two to three, with both possibly flight-ready by the end of October. NASASpaceflight

  • Three experiments in computing from orbit. Thursday's rideshare carried three payloads that each take on one leg of the orbital-data-centre idea: Cowboy Space's Reason-1, which will try to send solar power to the ground as an infrared laser beam; Google's Project Suncatcher demonstrator, built with Planet Labs, running AI chips in orbit; and Star Catcher's Protostar, which will beam power across to a separate small satellite. This is why rideshares are suddenly interesting again: one Falcon 9 carried the first real flight tests of a business everyone has been talking about on paper. Google's satellite flies four Trillium chips on roughly a kilowatt of solar power, and they must idle every 15 to 20 minutes to shed heat. Payload

  • Falcon Heavy | NROL-97 — was set to lift from pad 39A at 03:53 UTC Friday with a classified National Reconnaissance Office payload, the agency's first ride on the three-core rocket after 22 missions on single Falcon 9s. The outcome was not confirmed when this issue closed. It was also meant to be SpaceX's third Falcon launch of the day and the first time it recovers four boosters inside one day — worth checking the result before you believe either. New centre core B1106 is expended; side boosters B1104 and B1072, which flew the Nancy Grace Roman Space Telescope a month ago, come back to Landing Zones 1 and 2. Spaceflight Now

  • China's 2026 launch count — stands at 70 orbital attempts after a Long March 8A put the 26th Guowang internet batch up from Hainan on 23 September and a Long March 6A flew the fourth Yaogan-40 trio from Taiyuan the next day. Clearing 100 launches in a calendar year for the first time would take at least 31 more before the year ends. It tells you how dense the next three months of Chinese launch coverage will be, and where the crewed flight sits in it. Shenzhou-24 now looks like a November flight on a Long March 2F from Jiuquan; reports that a Pakistani payload specialist will be aboard, which would be Tiangong's first foreign visitor, are expected but not officially confirmed. SpaceNews

  • Katalyst's Link — NASA and the company have now described what broke on the attempt to reboost the ageing Swift observatory. A switch in the power electronics driving the reaction wheels failed, software workarounds held for a few weeks, then an unresponsive thruster valve set the spacecraft spinning and the rendezvous was abandoned. This is the first honest debrief of a commercial satellite rescue, and the parts everyone doubted — robotic arms, plasma thrusters — are the parts that worked. Built in nine months under a $30 million contract, Link still manoeuvred to about 10 km from Swift for navigation tests before reentering on 25 September. Ars Technica

  • Canada Rocket Company — the Toronto outfit, one of three funded this spring under Ottawa's Launch the North programme, is going straight to a medium-lift vehicle. The R-2 would use nine methane engines and landing legs, carry up to 12.5 tonnes to low Earth orbit, and could fly by 2032 if everything goes right. A national launch effort driven by sovereignty politics rather than a customer is a new entrant worth watching from the start, not from its first hop. About 30 staff, $22.5 million raised so far, and a $30 million engine test site named for Jeremy Hansen on 50 leased acres near London, Ontario. Ars Technica

  • Andøya Spaceport — the Norwegian government proposes almost NOK 650 million (close to €60 million) for a second orbital pad, with the state owning it and leasing it to Andøya Space. That reverses the earlier plan, under which a second pad depended on the operator landing a long-term customer first. Pad one belongs to Isar Aerospace for years to come, so this is the thing that decides whether anyone else in Europe can launch from Norwegian soil this decade. An initial NOK 323.3 million would sit in the 2027 budget, published on 7 October; Isar's Spectrum flew successfully from pad one on 5 September 2026 with FramSat-1 aboard. European Spaceflight

  • Foundational — is a London company out of stealth with an £8.2M pre-seed round to turn satellite laser ranging into a service: small mirrors flown on customer satellites, automated ground stations that fire laser pulses and time the return, and software that turns that into very precise positions. Conjunction warnings are only as good as the orbit knowledge behind them, and uncertain positions are why operators dodge things they never needed to dodge. It only works on satellites carrying its reflectors — 16 are in orbit with around 60 waiting to fly — and service is planned for early 2027 from the first three or four stations. Payload

One takeaway

Set an alarm for Monday at 08:17 UTC. The next firm thing on the board is a Falcon 9 with the Space Development Agency's Tranche 1 Transport Layer A, listed as Go for Monday 5 October at 08:17 UTC. The window opens and closes at the same minute, so there is no waiting out a boat or a cloud: it goes on time or it goes another day.

If you only get up for one launch this weekend's end, make it the one that cannot drift inside its window. Window start and window end are both 08:17 UTC — an instantaneous window. Space Launch Now

Get the next one in your inbox

Free. One confirmation email, then issues. Unsubscribe in one click.

Share this issue

How this issue was made. Researched and written by an agent, produced on 2 October 2026, 04:09. 34 sources read, 0 unreachable. Every link above goes to the primary source. A person sets the brief and steers it; no person edited this text before it was sent.

Every issue

Also as a feed: RSS · JSON

Something wrong in this issue? Tell us